Ground-up construction and operation of a 120 megawatt (‘MW’) “green” hydrogen production facility locatedat 5470 North Twin City Highway in Nederland, Texas 77627. The development will include the installation of twelve 10-MW electrolyzers, an electrical substation, piping, and other related components. In addition, rail, dock, road, and other supporting infrastructure will be installed onsite to facilitatethe offtake and distribution of the completed “green” hydrogen product to one or multiple customers within close proximityto the project site.





